Böhme, T, Escribano, A, Heffernan, E E and Beazley, S (2018) Causes and mitigation for declining productivity in the Australian mid-rise residential construction sector. Built Environment Project and Asset Management, 8(03), 253–66.

  • Type: Journal Article
  • Keywords: Australia; Case study; Lean production; Project management; Offsite construction; Building information modelling; Construction productivity; Complexity-reduction strategies; Mid-rise residential;
  • ISBN/ISSN: 2044-124X
  • URL: https://doi.org/10.1108/BEPAM-10-2017-0097
  • Abstract:
    The construction industry is a significant driver of economic activity in many countries. However, there has been a lack of growth in productivity within the Australian construction sector over recent years. The purpose of this paper is to gain an in-depth understanding of the causes for declining productivity within the Australian mid-rise residential construction network. Design/methodology/approach Two in-depth case studies have been conducted with a builder and developer, both significant entities of the Australian mid-rise residential construction network. Case study data collection comprised a five-stage process including semi-structured interviews and archival information review. Findings Drivers for declining construction productivity were identified under the categories of: industry-, firm- and project-level productivity. The drivers include: incomplete documentation, design changes, inefficient project management, supply chain fragmentation, among others. Originality/value The contribution of this study is the identification and categorisation of major issues impacting sector productivity along the mid-rise residential construction supply chain. The research identified that the substructure and superstructure are the construction phases during which most productivity losses occur. Mitigations are discussed in terms of systemic sector productivity increases at an industry, firm and project levels.

Hasan, A, Elmualim, A, Rameezdeen, R, Baroudi, B and Marshall, A (2018) An exploratory study on the impact of mobile ICT on productivity in construction projects. Built Environment Project and Asset Management, 8(03), 320–32.

Javed, A A, Pan, W, Chen, L and Zhan, W (2018) A systemic exploration of drivers for and constraints on construction productivity enhancement. Built Environment Project and Asset Management, 8(03), 239–52.

Ling, F Y Y (2018) International comparison of performance of public projects. Built Environment Project and Asset Management, 8(03), 281–92.

Ohueri, C C, Enegbuma, W I, Wong, N H, Kuok, K K and Kenley, R (2018) Labour productivity motivation framework for Iskandar Malaysia. Built Environment Project and Asset Management, 8(03), 293–304.

Tanko, B L, Abdullah, F, Mohamad Ramly, Z and Enegbuma, W I (2018) An implementation framework of value management in the Nigerian construction industry. Built Environment Project and Asset Management, 8(03), 305–19.

Ugulu, R A and Allen, S (2018) Using the learning curve theory in the investigation of on-site craft gangs’ blockwork construction productivity. Built Environment Project and Asset Management, 8(03), 267–80.